A-A-53506
Instructions. Adequate instructions for heat treating and using the platinum alloy wire shall be furnished with each package.
Identification marking. Each length of wire shall be die stamped with an identification or trademark at one end. Ends may be flattened for this purpose.
Workmanship. The platinum alloy wire shall be free from defects which detract from its appearance or impair its serviceability.
Unit. Each (EA). Each four pennyweight of wire in two lengths, as specified, constitutes one unit.
Quality Assurance Provisions.
Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contact or purchase order, the contractor may use his own or any facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.
Records. Records of examinations and tests performed by or for the contractor shall be maintained by the contractor and made available to the Government upon the Government’s request, at any time, or from time to time, during the performance of the contract and for a period of three years after delivery of the supplies to which such records relate.
Inspection. Inspection, as used herein, is defined as both examination (such as visual or auditory investigation without the use of special laboratory appliances or procedures) and testing (determination by technical means of physical and chemical properties). Sampling for inspection shall be performed in accordance with MIL-STD-105, except where otherwise indicated hereinafter.
Certificates of quality. Certificates of quality, supplied by the manufacturer of the component or materials, may be furnished in lieu of actual performance of such testing by the contractor, provided lot identity has been maintained and can be demonstrated to the Government.
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business