A-A-51997
Workmanship. The mandrel shall be free from defects which detract from its appearance or impair its serviceability.
Unit. Package (PG). One package containing six mandrels, as specified, constitutes one unit.
Quality Assurance Provisions.
Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contact or purchase order, the contractor may use his own or any facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.
Records. Records of examinations and tests performed by or for the contractor shall be maintained by the contractor and made available to the Government upon the Government’s request, at any time, or from time to time, during the performance of the contract and for a period of three years after delivery of the supplies to which such records relate.
Inspection. Inspection, as used herein, is defined as both examination (such as visual or auditory investigation without the use of special laboratory appliances or procedures) and testing (determination by technical means of physical and chemical properties) of the item.
Sampling for inspection. Sampling for inspection shall be conducted in accordance with MIL-STD-105 and as specified herein. The unit of product for test purposes shall be one mandrel. Unless otherwise specified, sampling for examination shall be conducted at inspection level II, AQL 2.5, and sampling for tests (when applicable) shall be conducted at inspection level S-1, AQL 1.0.
Contractor certification. The contractor shall certify that the product offered meets the salient characteristics of this description and conforms to the producers’ own drawings, specifications, standards, and quality assurance practices. The Government reserves the right to require proof of such conformance prior to first delivery and thereafter as may be otherwise provided for under the provisions of the contract.
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business